Blue Star Helium commenced drilling the State 16 SWSE 3054 well at its Galactica helium project in Las Animas County, Colorado. The initial conductor section of the well has been completed to a depth of 38ft, with the casing cemented. The drilling operations will now progress through the intermediate section to reach the Lyons formation, with the total planned drilling depth aimed at the upper Lyons gas reservoir. Drilling to this depth is expected to take 5 to 7 days, followed by wireline logging and a flow and pressure testing phase lasting at least five days.
top of page
Search
Recent Posts
See AllIn a recent social media post, Blue Star Helium shared a video showing that the preparations to drill the State 16 development well at...
bottom of page