top of page

Pulsar Helium Advances Appraisal at Topaz Project

Pulsar Helium reported promising preliminary interpretations for the Jetstream #1 well at its Topaz helium project in Minnesota, indicating a gas-saturated interval with potential productive permeability between 503 and 671 meters. Despite incomplete wireline data due to dry borehole conditions, reliable mineralogy and porosity models have been established, suggesting productivity associated with fractures. The well, designed for helium production, showed up to 13.8% helium concentrations. Additional wireline logs and lab analyses are planned to refine evaluations. A well testing package is on hold until post-Spring road restrictions, set to include flow testing and an expanded wireline data acquisition to confirm reservoir characteristics and prepare for production.

Want to read more?

Subscribe to akapenergy.com to keep reading this exclusive post.

Recent Posts

See All
bottom of page